Skip to content
Excavator reconstructing the retention system at Pecan Grove Marina in Oriental, NC

/ Project · $150K (Completed)

Pecan Grove Marina — 3-Level Retention System Reconstruction.

Client

Pecan Grove Marina

Role

Prime Contractor

Location

Oriental, NC

Year

2025

Value

$150K

/ Scope

Reconstruction of a three-level marina retention system at Pecan Grove Marina in Oriental, North Carolina. Work included excavation, grading, bank stabilization, and retention-system reconstruction to prepare the site for NC Corps of Engineers inspection.

/ Project Photos

Site gallery.

Photos rotate every 3 seconds. Click the large image to view it full size without losing the navigation arrows.

1 / 10

/ Next

Need a contractor with this kind of execution?